COMMERCIAL
Tim Hortons
The Project
Building a drive through. Works Undertaken:
-
New extension including foundations,
-
brick work and reinforced concrete slabs.
-
Internal and external drainage
-
Demolition to existing retail unit
-
Hard and soft landscaping
-
Construction of new drive through
Location
North London
Contract Value
£450k
Start Date
April 2022
Duration
3 Months
Marks & Spencer’s
The Project
To enable an area outside for new intake of deliveries and inside freezer. Works Undertaken:
-
New mains water service trenches
-
External and Internal drainage; new drainag runs
-
New electric service trenches; including
-
construction of a new substation.
-
Surfacing and hard landscaping works
Location
Purley Way
Contract Value
£650k
Start Date
JULY 2023
Duration
5 Months
Co-Op
The Project
Removed existing groundworks area to form new foundations and brickwork. Works Undertaken:
-
Deep drainage
-
Instillation of new drainage
-
Reduce level digging.
-
Construction of a new extension including foundations and RC concrete slab
-
Brick work and demolition
Location
Ashington
Contract Value
£50k
Start Date
September 2023
Duration
1 Months
Sainsburys
The Project
Retaining wall, removed, and then excavated to build a new retaining wall for the delivery exit. Works Undertaken:
-
Demolition of existing brick built retaining wall.
-
Instillation of new RC concrete retaining wall
-
Brick work & road markings